· Shelving
· Drawer racking
· Mezzanine
· Selective pallet racking
· VNA racking
· Drive-in racking
· Push-back racking
· Flow racking
· Mobile racking
· Cantilever racking
· Stacking racking
· Flexible racking
· Wire mesh wall
· Flodable wire container
· Roller trolly
· Auxilliaries

Order Process:

1、Once customer requires, we will dispatch Business Manager to customer’s plant and know customer’s use demands as well as surveying the detailed data of the field usage for customer’s racking within 8 hours.
2、Within a working-day, we will customize a set of advisable and economical design plan for the customer. And we will quote after confirmed by the customer.
3、As for the customer’s suggestion, we will revise or adjust the plan and then confirm the order.
4、After the order is confirmed, our company will arrange the production. According to the difference of quantity and specification, the eligible products will be delivered to the customer within 2 to 15 working-days.
5、We will dispatch the installation team to set and debug the racking. And then the customer need to complete the opinion letter after their inspection and acceptance. Hitherto, the order is finally completed.

Maintenance inspection provision:

1、The inspection goods service condition and amortizes the situation;
2、Inspects the column, the crossbeam whether do distort, whether thereis damages;
3、Inspects the safety pin is whether complete, whether the overallsafety coefficient does drop;
4、Inspection inflation bolt and other facilities whether do needto replace;
5、The inspection personnel earnestly fills in the report of examination,and keeps a junction to the customer.

Project management pledge

· Project flow:

This company materially beneficial project control system, eachcustomer responsibly provides the service by the specialist, theproject person in charge is responsible to coordinate between thecustomer and company's matters concerned, and is responsible tocoordinate the company various departments to provide the service forthe customer.

· Project management:

1、According to the project flow, each procedure is responsible by thespecialist to manage.
2、The design department basis sign book design goods frame, and issuesthe production task list.
3、The production department meets the production task list, according tothe list manufacture, and carries on along with examines.
4、The quality testing department carries on the stochastic inspection inthe production process, and had finished after the production carrieson the spotcheck.
5、After a goods production completes the packing to go into storage,then transports to the scene.
6、Installs the scene by to install the person in charge to carry on thedivision of labor, according to designs the blueprint which thedepartment writes up to carry on the installment.
7、Installs when must have the quality testing department to carry on theinspection, after had finished should completely careful carry on theinspection.

· Matters needing attention:

1、Practically carries out this company's rules and regulations, achievedrequests production, installment quality.
2、The specialist is responsible, each department person in charge isresponsible for the project person in charge, the project person incharge is responsible for the customer.

Products
Cantilever racking

The Vallink cantilever racking are ideal for storing different types of long, bulky material such as furniture, bar stock, appliances, lumber pipe, variable sized boxes, long metal parts, carpet or vinyl flooring. Single and double sided columns available. Fits extra heavy-duty and super capacity straight arms.

Back
Copyright SUZHOU VALLINK RACKING MANUFACTURING CO., LTD
Address:No. 2, Mingbang Rd, Xinhua Industrial Park, Xiangcheng District, Suzhou ICP:07002359845